Steel skeleton polyethylene composite pipe using method

Steel skeleton plastic composite pipe is referred to plastic composite pipe reinforced with steel wire mesh or perforated steel plate on the inner wall of the pipe. This new type of pipe with high strength plastic steel mesh skeleton and thermal plastic steel mesh skeleton polyethylene composite pipe plastic polyethylene as raw material, wire mesh as the polyethylene plastic pipe reinforced body, with high density polyethylene (HDPE) as the matrix, the high performance of HDPE modified resin bonding wire skeleton and the inner the outer layer, high density polyethylene are closely linked, so that it has excellent composite effect.

Steel skeleton plastic composite pipe with high strength steel wire reinforced body is covered in the continuous thermoplastic plastics, so the compound tube overcomes the disadvantages of steel pipe and plastic pipe, and keeps the advantages of steel pipe and plastic pipe. Steel mesh skeleton plastic composite pipe, using high-quality materials and advanced production technology, so that a higher voltage performance. At the same time, the composite pipe has excellent flexibility, suitable for long distance buried with water supply, gas transmission pipeline system. Pipe steel mesh skeleton polyethylene composite pipe is used in polyethylene electrofusion fittings. Connection, the pipe internal body heat pipe outer plastic pipe fittings and the inner plastic melt, the pipe and pipe fittings reliably connected together.

Gas transmission and distribution engineering provisions in polyethylene and steel skeleton polyethylene composite pipe laying?
1, polyethylene and steel skeleton polyethylene composite pipe shall meet the requirements of current national standard "technical regulation" polyethylene gas pipeline project, the CJJ63. Pipeline construction should be established before the construction scheme, determine the connection method, connection condition, welding equipment and tools, operating norms, the welding parameters, the operator's technical level requirements and quality control method.
2, the pipe connection to connect equipment according to the instruction manual for examination, in the use of the process should be checked periodically.
3, the pipe connection, should be checked for pipes, pipe specifications, pressure rating connection: check the pipe surface, not to bump, scratch, bruise depth should not exceed the pipe wall thickness of 10%.
4, pipe connection should be conducted at ambient temperature -5 ~ 45 ℃. When the environment temperature is below -5 ℃ or in the wind is greater than 5, the weather conditions, wind, thermal insulation measures should be taken, and adjust the connection technology. Pipeline connection process, should avoid strong direct sunlight and the influence of welding temperature.
5, when the pipe, fittings and the construction site storage of large temperature difference, connection pipes, pipe fittings shall be set aside some time in the construction site, the temperature and the temperature close to the construction site.
6, after the completion of the joint should be natural cooling, mobile joints, remove to a tool or external force exerted on the joint shall be in cooling process.
7, the pipeline connection is completed, should be the number markers, and record.
8, the pipeline should be elevation and tube based quality inspection in the ditch, we can ditch.
9, pipe installation, pipe ditch water should be pumping, every day, open the pipe end temporary plugging.
10, do not use metal materials directly binding and lifting pipeline. The pipeline trench should prevent scratch, distorted and strong extension.
11, to cross the railway, highway, river city, the main road of pipeline, should reduce the interface, and through the pipe before the deal with connection good strength and tightness test.
12, pipe, pipe fittings from production to use between the storage time, the yellow line should not be more than 1, years, black pipe should not be more than 2 years. Over the period must be re sampling inspection, qualified before use.

Construction of buried steel skeleton polyethylene composite pipe pipe, pipe in gas pipeline storage requirements?
1, pipe, pipe fittings should be stored in a well ventilated, temperature less than 40 ℃ storehouse. Not open storage, not near the heat source. Should not be torn off the protective sleeve or removed at both ends sealing cover before use.
2, the level of the tubes shall be stacked in the support on the flat or on the ground. Stacking height should not be more than 1.5m; when to take protective measures, stacking height can be properly increased, but should not be more than 3m. pipe fittings shall be stacked neatly by, that did not fall, and is convenient for taking and management.
3, pipe, pipe fittings in the outdoor temporary piling shall cover.
4, the pipe should be stored, classification of different diameter and wall thickness of the pipe pile. Pointed convex objects stacking place should not have may damage the pipe.
Electrothermal welding engineering specification for buried steel skeleton polyethylene composite pipe gas pipeline?
1, electric melting connection machine and electric melting pipe shall be connected correctly. Electrothermal melting by connecting the connecting tool, should meet the pipe with electric heating voltage, current, heating time, cooling time requirements.
2, in the electric welding and cooling period shall not be mobile connection equipment, pipes and pipe fittings, without any external force is applied on it.
3, electric melting connection shall be in accordance with the following provisions:
1) connecting end electric melting connection pipe cutting should be vertical, and should be used to clean cloth wipe pipe and pipe fittings connected surface dirt, mark the depth of insertion, removal of the surface oxide layer.
2) electric melting connection, should use the connection centralizing tool for straightening to pipe and pipe connection, which are on the same axis.
In 4, the installation site should be made when cutting pipe, pipe section and the vertical axis, and should make the section processing. Prohibited the use of pipe, pipe exposed steel or steel wire in the end.
5, the electric melting sleeve and pipe with too loose, deal with the school, eliminate not normal; tight should use the scraping scraping machine.

主站蜘蛛池模板: 久久精品无码国产一区二区三区| 国产91高跟丝袜| 日韩在线视频网站| 在线日本国产成人免费的| 992Tv视频国产精品| 国产激爽大片在线播放| 免费人成在线观看视频色| 国产精品私拍99pans大尺度| 亚洲三级a| 国产高清无码麻豆精品| 在线观看无码a∨| 久草美女视频| 久久夜色精品| 国产成人高清精品免费5388| 日本精品中文字幕在线不卡 | 亚洲狠狠婷婷综合久久久久| www.日韩三级| 国产一区二区三区在线观看视频 | 麻豆精品视频在线原创| 久久精品66| 巨熟乳波霸若妻中文观看免费| 在线观看亚洲精品福利片| 毛片网站在线看| 伊人无码视屏| 人妻丰满熟妇av五码区| 2020最新国产精品视频| 国产精品主播| 免费99精品国产自在现线| 亚洲视频无码| 伊伊人成亚洲综合人网7777 | 2021国产v亚洲v天堂无码| 超清无码熟妇人妻AV在线绿巨人| 小蝌蚪亚洲精品国产| 午夜视频免费试看| 亚洲欧洲日韩久久狠狠爱| 97人人做人人爽香蕉精品| 精品三级网站| 午夜激情婷婷| 一本大道无码日韩精品影视| 亚洲综合色婷婷中文字幕| 国产日本一区二区三区| 偷拍久久网| 天天做天天爱天天爽综合区| 波多野结衣中文字幕一区二区| 操国产美女| 久久99精品国产麻豆宅宅| 国产亚洲精久久久久久久91| 在线色国产| 欧洲精品视频在线观看| 日本一本正道综合久久dvd| 玖玖精品视频在线观看| 久久午夜影院| 亚洲乱码视频| 精品超清无码视频在线观看| 国产精品太粉嫩高中在线观看 | a国产精品| 国产精品成人第一区| 99福利视频导航| 久久国产精品嫖妓| 波多野结衣无码AV在线| 亚洲AV无码久久天堂| 久久成人免费| 国产精品免费久久久久影院无码| 国产综合无码一区二区色蜜蜜| 亚洲天堂网在线视频| 超碰aⅴ人人做人人爽欧美| 一级爆乳无码av| 91尤物国产尤物福利在线| 欧美色综合久久| 国产精品女熟高潮视频| 亚洲美女一区| 99这里只有精品在线| 三上悠亚在线精品二区| 美女被狂躁www在线观看| 狠狠做深爱婷婷综合一区| 福利视频99| 精品小视频在线观看| 视频二区中文无码| 国产成人亚洲精品蜜芽影院| 欧美午夜小视频| 在线观看免费国产| 久久黄色视频影|