试看120秒男女啪啪免费,国产一在线观看,国产精品亚洲天堂,亚洲不卡av中文在线,国产乱肥老妇精品视频,97国产在线视频,免费在线国产一区二区三区精品 ,日韩 欧美 小说 综合网 另类
TEL
400-009-6770 022-88970860
Company news

Steel skeleton polyethylene composite pipe using method

Steel skeleton plastic composite pipe is referred to plastic composite pipe reinforced with steel wire mesh or perforated steel plate on the inner wall of the pipe. This new type of pipe with high strength plastic steel mesh skeleton and thermal plastic steel mesh skeleton polyethylene composite pipe plastic polyethylene as raw material, wire mesh as the polyethylene plastic pipe reinforced body, with high density polyethylene (HDPE) as the matrix, the high performance of HDPE modified resin bonding wire skeleton and the inner the outer layer, high density polyethylene are closely linked, so that it has excellent composite effect.

Steel skeleton plastic composite pipe with high strength steel wire reinforced body is covered in the continuous thermoplastic plastics, so the compound tube overcomes the disadvantages of steel pipe and plastic pipe, and keeps the advantages of steel pipe and plastic pipe. Steel mesh skeleton plastic composite pipe, using high-quality materials and advanced production technology, so that a higher voltage performance. At the same time, the composite pipe has excellent flexibility, suitable for long distance buried with water supply, gas transmission pipeline system. Pipe steel mesh skeleton polyethylene composite pipe is used in polyethylene electrofusion fittings. Connection, the pipe internal body heat pipe outer plastic pipe fittings and the inner plastic melt, the pipe and pipe fittings reliably connected together.

Gas transmission and distribution engineering provisions in polyethylene and steel skeleton polyethylene composite pipe laying?
1, polyethylene and steel skeleton polyethylene composite pipe shall meet the requirements of current national standard "technical regulation" polyethylene gas pipeline project, the CJJ63. Pipeline construction should be established before the construction scheme, determine the connection method, connection condition, welding equipment and tools, operating norms, the welding parameters, the operator's technical level requirements and quality control method.
2, the pipe connection to connect equipment according to the instruction manual for examination, in the use of the process should be checked periodically.
3, the pipe connection, should be checked for pipes, pipe specifications, pressure rating connection: check the pipe surface, not to bump, scratch, bruise depth should not exceed the pipe wall thickness of 10%.
4, pipe connection should be conducted at ambient temperature -5 ~ 45 ℃. When the environment temperature is below -5 ℃ or in the wind is greater than 5, the weather conditions, wind, thermal insulation measures should be taken, and adjust the connection technology. Pipeline connection process, should avoid strong direct sunlight and the influence of welding temperature.
5, when the pipe, fittings and the construction site storage of large temperature difference, connection pipes, pipe fittings shall be set aside some time in the construction site, the temperature and the temperature close to the construction site.
6, after the completion of the joint should be natural cooling, mobile joints, remove to a tool or external force exerted on the joint shall be in cooling process.
7, the pipeline connection is completed, should be the number markers, and record.
8, the pipeline should be elevation and tube based quality inspection in the ditch, we can ditch.
9, pipe installation, pipe ditch water should be pumping, every day, open the pipe end temporary plugging.
10, do not use metal materials directly binding and lifting pipeline. The pipeline trench should prevent scratch, distorted and strong extension.
11, to cross the railway, highway, river city, the main road of pipeline, should reduce the interface, and through the pipe before the deal with connection good strength and tightness test.
12, pipe, pipe fittings from production to use between the storage time, the yellow line should not be more than 1, years, black pipe should not be more than 2 years. Over the period must be re sampling inspection, qualified before use.

Construction of buried steel skeleton polyethylene composite pipe pipe, pipe in gas pipeline storage requirements?
1, pipe, pipe fittings should be stored in a well ventilated, temperature less than 40 ℃ storehouse. Not open storage, not near the heat source. Should not be torn off the protective sleeve or removed at both ends sealing cover before use.
2, the level of the tubes shall be stacked in the support on the flat or on the ground. Stacking height should not be more than 1.5m; when to take protective measures, stacking height can be properly increased, but should not be more than 3m. pipe fittings shall be stacked neatly by, that did not fall, and is convenient for taking and management.
3, pipe, pipe fittings in the outdoor temporary piling shall cover.
4, the pipe should be stored, classification of different diameter and wall thickness of the pipe pile. Pointed convex objects stacking place should not have may damage the pipe.
Electrothermal welding engineering specification for buried steel skeleton polyethylene composite pipe gas pipeline?
1, electric melting connection machine and electric melting pipe shall be connected correctly. Electrothermal melting by connecting the connecting tool, should meet the pipe with electric heating voltage, current, heating time, cooling time requirements.
2, in the electric welding and cooling period shall not be mobile connection equipment, pipes and pipe fittings, without any external force is applied on it.
3, electric melting connection shall be in accordance with the following provisions:
1) connecting end electric melting connection pipe cutting should be vertical, and should be used to clean cloth wipe pipe and pipe fittings connected surface dirt, mark the depth of insertion, removal of the surface oxide layer.
2) electric melting connection, should use the connection centralizing tool for straightening to pipe and pipe connection, which are on the same axis.
In 4, the installation site should be made when cutting pipe, pipe section and the vertical axis, and should make the section processing. Prohibited the use of pipe, pipe exposed steel or steel wire in the end.
5, the electric melting sleeve and pipe with too loose, deal with the school, eliminate not normal; tight should use the scraping scraping machine.

主站蜘蛛池模板: 综合人妻久久一区二区精品| 熟女成人国产精品视频| 久久77777| 久久久精品无码一区二区三区| 全部免费特黄特色大片视频| 亚洲欧美精品一中文字幕| 人人爽人人爽人人片| julia中文字幕久久亚洲| 91在线免费公开视频| 911亚洲精品| 欧美a在线看| 成人午夜免费观看| 亚洲色图综合在线| 亚洲精品制服丝袜二区| 伊在人亞洲香蕉精品區| 亚洲午夜综合网| 亚洲天堂久久久| 青青草国产免费国产| 成人福利在线观看| 午夜少妇精品视频小电影| 国产免费a级片| www.99在线观看| 国产午夜看片| 熟女日韩精品2区| 精品国产黑色丝袜高跟鞋| 在线播放91| 伊人精品视频免费在线| www.亚洲一区| 四虎成人免费毛片| 亚洲婷婷在线视频| 久久特级毛片| 在线视频亚洲色图| 久久精品一品道久久精品| 97久久人人超碰国产精品| 毛片大全免费观看| 免费不卡在线观看av| 亚洲欧美一区二区三区蜜芽| 婷婷在线网站| 中文字幕亚洲精品2页| 国产中文一区a级毛片视频 | 狠狠色狠狠综合久久| 国产精品白浆在线播放| 国产成人久视频免费| 人妻无码中文字幕一区二区三区| a毛片免费在线观看| 日本三区视频| 免费在线不卡视频| 99国产在线视频| JIZZ亚洲国产| 老熟妇喷水一区二区三区| 色综合天天综合| 国产日韩丝袜一二三区| 国内精品小视频在线| 91精品国产麻豆国产自产在线| 女高中生自慰污污网站| 免费国产福利| 深夜福利视频一区二区| 久久情精品国产品免费| 99er这里只有精品| 无码中文字幕精品推荐| 久久久久亚洲av成人网人人软件| 亚洲天堂视频网| 免费人成视网站在线不卡| 免费av一区二区三区在线| 日韩区欧美区| 色成人亚洲| 欧美综合成人| 波多野结衣一二三| 亚洲,国产,日韩,综合一区| 久久精品这里只有精99品| 国内精品一区二区在线观看 | 女人一级毛片| 91小视频版在线观看www| 国产性精品| 亚洲制服丝袜第一页| 日韩中文无码av超清| 91精品国产91久久久久久三级| 欧美激情视频一区二区三区免费| 国产精品无码久久久久久| 久操中文在线| 中文字幕丝袜一区二区| 国产成人一区|